Guest Bath Remodel, March/April, 2026

We decided that it was time to update and remodel our 5' x 9' guest bathroom and here are the photos that show what we did! Well, they show what our contractor did anyway. They took it down to the bones and beyond!

 

Existing

 

 

 

Preparing for Construction

Monday, March 23

 

Demolition

 

 

The trash trailer

 

Wednesday, March 25

What lies behind the walls

 

Electrical wall  worms

Where the sink used to be

New plumbing and drainage. The plumbing could not go around through the wall or above the ceiling so they had to remove some concrete

 

piping for the thermostatic controller

Piping for the new shower head and wand

 

Thursday, March 26

 

 

New concrete

 

Friday, March 27

New framing for the niche

New plumbing for the vanity and toilet 

 

Saturday, March 28

Water-proofing the shower basin

 

Tuesday, March 31

Electrical and plumbing for the mirror, sconces and vanity

 

 

Wall snake

Setting tile

Tile for the niche

 

Thursday, April 2 

Behind the toilet

Shower floor

Tile continuing toward the door

Shower and niche

 

Friday, April 3

Shower floor tile and drain

The whole shower

Wall tiles. Vanity will be to the left

Niche taking shape. No grout yet.

 

Saturday, April 4

Constructing the shower "curb"

Adding the shelf 

Repairing and re-doing the drywall to match the tile

 

Monday, April 6

The toilet drain had to be moved o few inches away from the wall

Adding texture to the wall

The new drain

Painted drywall and texture detail

 

Tuesday, April 7

Shower is grouted!

Walls are all painted, electric is mostly in. Starting on the floor

Which way shall we orient the tile?

 

Wednesday, April 8

This way! Pre-grout

We chose the lighter color grout

 

Thursday, April 9

Shower before glass

Glass door and panel installed

 

Friday, April 10

Mirror and sconces

The floor is grouted

Door is open showing the niche and controller

The finished niche

Vanity partially installed

Anchors for the new smart toilet

Water supply and power for the toilet

 

Saturday, April 11

Last day! The smart toilet is in!

The toilet "remote" (not really that remote!) Temporary towels

View from the shower

<<<<<Previous     Next>>>>>